Outdoor Pathway and Entrance Regeneration

Oasis Academy Hadley, a community centred school committed to delivering excellent education and making a difference in the world around us, decided it was time to give the entrance area which was tired and looking a little untidy into an entrance which would reflect their Excellency.

Pathway regeneration, safety path Enfield, London

Oasis and Lets Play, together with Theobalds formed a partnership working together to devise the perfect entrance area, transforming it into a beautiful, tidy and eye-catching area which would be beautiful all year round.

Groundwork and drainage

The area was completely stripped back, firstly to enable the installation of a drainage system to prevent water logging and accumulation of water to the area followed by a sub-base to ensure the success and longevity of the area. A new connecting tarmac was laid and re-positioned to allow easier access.

Low maintenance resin bonded mulch

The area where the trees ran unnoticed down the fence line was transformed by installing a low level treated timber planter running the full length of the path to create a modern, elegant and contemporary look.

The area was then completed by laying resin bonded mulch creating a seamless natural finish to a now eye-catching and low maintenance area.

Here’s some before, during and after project images

Customer Website: www.oasisacademyhadley.org